HIVE Digital Secures 7.2 MW Toronto Site for Groundbreaking Canadian AI Data Hub
HIVE Digital just planted its flag in Toronto’s tech gold rush—snagging a 7.2 MW site to build Canada’s next-gen AI data hub. Because what’s hotter than AI and crypto? Combining them while energy’s cheap.
Power Play in the North
The former crypto miner turned AI infrastructure player is pivoting harder than a VC chasing hype cycles. That 7.2 MW capacity? Enough to juice both blockchain validators and large language models—assuming the power grid doesn’t collapse first.
From Bitcoin to Bot Brains
HIVE’s betting its repurposed mining ops can monetize Canada’s cold climate and cheaper electricity. Because nothing says ‘efficient capital allocation’ like chasing two volatile sectors at once.
Closing Thought: At least they’re not burning cash on metaverse real estate this time.