BTCC / BTCC Square / Coindesk /
Cipher Mining Ignites 300 MW Black Pearl Facility – Bitcoin Production Goes Live

Cipher Mining Ignites 300 MW Black Pearl Facility – Bitcoin Production Goes Live

Author:
Coindesk
Published:
2025-06-23 20:34:06
9
1

Cipher Mining Begins Bitcoin Production at 300 MW Black Pearl Data Center

Cipher Mining fires up its industrial-scale Bitcoin operation at the massive Black Pearl data center—because what’s a bear market when you’ve got 300 megawatts of hashing power?

Black Pearl awakens

The Texas-based facility—now humming with enough energy to power a small city—marks Cipher’s aggressive bet on Bitcoin’s long-term value proposition. No mining operation this size comes online without conviction (or VC money to burn).

Hash rate meets horsepower

300 MW translates to roughly 4.5 EH/s of added network security—just as institutional players start treating mining stocks like leveraged BTC calls. Timing is everything when you’re gambling with electricity futures.

The closer: Wall Street still thinks ASICs are farm equipment, but Cipher’s playing chess while TradFi counts beans. Their move? Mine through the cycle—because somebody’s gotta pay for those Texas-sized utility bills.

|Square

Get the BTCC app to start your crypto journey

Get started today Scan to join our 100M+ users